Jan 11 2025:

We continued to refine our robot concept and different field elements. This gave us more confidence in our concept to move toward our CAD model and breakdown the structure into 5 main assemblies.
1. Base

2. IntakeĀ 

3. Pivot

4. Articulation / Extension

5. Climb

Controls team loaded a model of the kitbot to a driving simulator to let them practice driving around the competition field. While some factors weren't accurate they gained some perspective of the drivers view from the driver station of various scoring elements.

The field build team made great headway on the Reef, and is nearly complete. After we make brackets and fixtures we'll be able to add the reef branches. We'll be looking to add paint soon.